Monolith — Design · Build · Deliver

From blueprint
to skyline.

A design-build contractor for towers that arrive on schedule. Scroll — the building goes up as you go down.

PH-01The Plan

Every tower starts as a promise on paper.

PH-02The Frame

Steel up. Forty floors of it, two per week.

PH-03The Skin

Curtain wall on, weather out, fit-out begins.

Delivered. On time. On budget.

01 — The record

Audited annually · bonded to $500M

0M

Square feet delivered

0

Towers topped out

0%

On-schedule completion

0

TRIR safety rating

02 — Selected work

2019 — 2026

  1. Meridian Tower

    2026
  2. Southbank Yards

    2025
  3. Foundry Hall

    2024
  4. Cascade Health Campus

    2024
  5. Port & Ninth

    2023
  6. Axle Logistics Hub

    2022

03 — Capabilities

Self-perform ratio 62%

/01

Design-Build

One contract, one team, no finger-pointing. Architects and builders in the same room from the first sketch.

/02

Preconstruction

Budgets that hold because they were real on day one. GMP within 2% on our last eleven towers.

/03

Self-Perform Concrete

Our own crews, our own formwork, our own schedule. The critical path stays in our hands.

/04

BIM / VDC

Every clash caught on screen costs nothing. We model to LOD 400 before mobilizing a single crane.

04 — Start a project

Bring us the
napkin sketch.

We price it, schedule it, and tell you the truth about both — inside ten working days.

Estimating desk

+1 (312) 555-0177

bids@monolith.build